Net Metering in Pakistan

Solar system with net Metering is a mechanism that allows for the export of excess electricity produced by solar panels to the grid. The trend of Net Metering in Pakistan has been relatively low, but it is gradually gaining momentum. A net meter, also known as a green meter, is integrated with on-grid or hybrid solar panel systems to enable the net metering mechanism. It is important to note that those planning to incorporate a net meter into their solar system must have a Three Phase electricity connection in order to export the surplus generated electricity back to the national grid.

What is Net Metering?

Net Metering Pakistan is a relatively new concept, but it offers many benefits for individuals with solar systems. Due to the long hours of sunlight and extended summer months, solar panels often generate around 20% to 40% more electricity than the average household needs. Net Metering solar simplifies the process of sending back the excess generated electricity from the solar panels to the national grid, allowing you to earn credits. These credits can be utilized when you require grid electricity during nighttime or when the solar panels don’t produce enough energy. It further reduces your electricity bills.

How to Apply for Net Metering?

To apply for net metering in Pakistan, you need to follow a series of steps, beginning with the installation of an on-grid or hybrid solar PV system at your home. Once the system is installed, you will need to obtain application approval from LESCO (Lahore Electric Supply Company) and NEPRA (National Electric Power Regulatory Authority), followed by the issuance of a license that allows for net metering. By following the NEPRA net metering rules you can easily get green meter installed at your home place. Let’s explore the step-by-step explanation of the net metering process, what is net metering, how to apply for net metering, and the necessary requirements for net metering. Let’s dig into everything you need to know about it.

Buysolar Net Metering Process in Pakistan

1. Installation of Solar System

As the national grid only imports the surplus energy generated by solar systems, it is essential to have an on-grid or hybrid solar system installed at your home before proceeding with net metering solar or the installation of a green meter in Pakistan.

2. Preparation of Application

After the successful installation of the solar system, our experienced and skilled team members provide comprehensive assistance to the client in preparing the application as per the guidelines of SRO 892 (1) 2015.

3. Inspection & NOC Issuance

Once the application approval is obtained, the process moves to the third phase, which involves inspection conducted by the Punjab Energy department. An electrical team inspects the system, and upon successful completion of the inspection, you will receive the NOC (No Objection Certificate) for net metering solar.

4. Signing of Agreement

This is a crucial step where an agreement is signed between the consumer and the local government energy provider, such as net metering LESCO, GEPCO, FESCO, ISECO, or QESCO. The agreement has a duration of three years, during which you are authorized to export the surplus energy to the national grid.

5. Allotment of Generation License

After signing the agreement, the legal document is submitted to NEPRA (National Electric Power Regulatory Authority) for verification by the governing body. Once the agreement is verified, you will be granted a license as an independent power producer for the next three years.

6. Activation of Net Metering

Once you have successfully obtained the generation license, your Net Metering will be activated, giving you the opportunity to save money while also earning from your solar system.

 

Benefits of Net Metering

Zero Electricity Bill

Net metering not only allow you to use the freedom of free electricity but also allow you to sell the electricity to the national grid which ultimately make you a person who pay zero electricity bills because the electricity used at night is compensate with the exported units to the national grid.

Energy Independence

Net metering promote self-sufficiency by enabling you to generate your own electricity. It reduces reliance on the grid and gives you more control over your energy production and consumption.

Return on Investment

Net metering provides a financial incentive for installing solar panels. As you generate excess electricity and earn credits, it can result in a return on your investment over time, making solar energy a financially viable option.

Net Metering Rates in Pakistan

Net Metering is a profitable mechanism for solar system owners in Pakistan, and its pricing can vary depending on the size and type of the system, as well as the specific city where you are applying. For example, LESCO n net meteringet metering may be lower than those for QESCO net metering. On the other hand, IESCO net metering rates could be higher due to its location in the federal area.

Solar system with net metering is a process of selling electricity back to the national grid. However, the NEPRA solar net metering price in Pakistan can vary based on the type and size of the system and whether the green meter is being installed for a domestic solar system or commercial premises. The installation of a green meter in Pakistan offers many benefits as it allows home users to pay minimal electricity bills due to the credits earned through exporting electricity this page has covered the all things from how to apply for net metering to net metering rates in Pakistan. you can also check the number of units you export to the national grid through the net meter app.

Buysolar has extensive experience in handling net metering applications and assisting clients in the approval and installation of green meters. Our professionals will guide you at every stage with utmost professionalism. If you are interested installing solar system with net metering in Pakistan, simply get in touch with us.